Sök:

Sökresultat:

7151 Uppsatser om Program- and project-stage - Sida 1 av 477

ini

Preporsition for bachelor thesis project, working from the inside and out. Emphasising spatial quality and experience, More or less ignoring form and program. I?ve had issues with these aspects in earlier project, the form or the program takes alot of place in the project. I haven?t tried this approach before, it?s an attractive thought to allow the project take a form of it?s own, enclosing those spaces i create.The initial concept was to place the pools on the ground (not digging them into the ground) making them volumes that divide and define spaces.

Prestandabaserad design genomkonceptuell energianalys : Performance-based design through conceptual energy analysis

This degree project aims to investigate the potential and possibilities for conceptual energyanalyses in the early stages of the design process. Many key decisions are made in theearly stages of a project regarding the shape and orientation of the building. Conceptualenergy analyses can provide the architects with insight regarding different design option?srelative energy performance.As the demands for more sustainable buildings increases, so does the need for earlyenergy analyses. Performing analyses in the early stage requires many assumptions andguesswork which could lead to a large margin of error.The offering from Autodesk is a module in Revit Architecture/MEP and the stand aloneprogram Project Vasari (under development).

Visualiseringsverktyg för Sykedjor

This thesis has been done in order to ease the process of drawing schematics ofelectrical wiring. The need arose after demand from the government due to a seriesof incidents that took place during the revision of the nuclear power plant in year2009.The task of the project has been to create a computer program that can generate agraphical representation of the electrical components relations. The basis for theprogram has been an example of how the client wants the graphical representation tolook. During the course of the project weekly meetings have occured in which theclient has reviewed the work.The result of the project is a program written in Visual Basic Applications that can berun in Microsoft Excel. The program is capable of generating graphics for a majority ofthe cases.

Lean och värdeskapadnde sjukvården : En fallstudie

Now a day?s there is dramatic change from traditional to digital information processing in construction industry. This change can be visualized in the project concept stage where it now has accessibility to join all the data in one place. Location-based planning technique simplifies scheduling by visualizing the schedule efficiently and has many advantages such as might shortened the project period by about 10 - 20 % if the company uses location-based technology, reducing risks in many ways by maintaining production continuity and identify collisions between things etc. Vico Office software has been used for Location based planning technique and in this thesis.The purpose of this thesis work was to demonstrate how location -based planning technology change the scheduling stage in Peab, potentially reducing the project time.

ÄTA-arbeten på Trafikverket

?ÄTA-work? (Changes, Supplementary and Retiring works) is more or less common in all construction projects whether it is about houses, roads or railways, in the planning stage, or in the construction stage. For the Swedish Transport Administration, which is the largest purchaser of infrastructure in Sweden, ÄTA-work is a hotter topic than ever.Economists and managers want to draw conclusions on the projects share ÄTA-work, while the project manager is concerned about whether it is possible to draw any conclusions at all as each project is unique in itself and has its own merits. There is a big variation in the amount of ÄTA-work in different geographic districts in the Swedish Transport Administration.This study shows that the Swedish Transport Administration does not have a unanimous approach regarding the management of ?ÄTA-work?.

Optimering av produktionstidsplan : Studie baserad på implementering av ny planeringsteknik i Peab Sverige AB

Now a day?s there is dramatic change from traditional to digital information processing in construction industry. This change can be visualized in the project concept stage where it now has accessibility to join all the data in one place. Location-based planning technique simplifies scheduling by visualizing the schedule efficiently and has many advantages such as might shortened the project period by about 10 - 20 % if the company uses location-based technology, reducing risks in many ways by maintaining production continuity and identify collisions between things etc. Vico Office software has been used for Location based planning technique and in this thesis.The purpose of this thesis work was to demonstrate how location -based planning technology change the scheduling stage in Peab, potentially reducing the project time.

Avbördningsekvationer för sjöar utan vattenföringsmätningar

Stage-discharge equations for lakes without disharge measurementsSimon AnderssonIn 2015 all lakes, rivers, coastal water and groundwater should be of good ecological statusaccording to the water framework directive from the European Union. In the process ofimproving the quality of Swedish water bodies, knowledge of where problems occur isneeded in order to utilize the resources optimally. The ability of lakes to store water is animportant factor since it controls the flow of water through the country. A stage-dischargeequation is a mathematical relation between discharge from a lake and its water level. Bybetter understanding of stage-discharge equations for lakes, their storage capacity can bedescribed better in hydrological models.This master thesis aims to evaluate methods for determining stage-discharge equations forlakes where a variable amount of field measurements is available.

Implementation av iterativ rastreringsmetod för färgbilder

This report describes the procedure in which we accomplished our task, which was to implement a present algorithm. This was made using C++. The algorithm is developed by Sasan Gooran, who is our examiner in this project. The algorithm uses an iterative method to produce the halftoned images. The reason for this project is to speed up the existing program which is made in Matlab.

Scenografi till Batboy - the musical

This is the project of making a stage design for Batboy ? the musical, a cooporation with a network of musical artists. The aim of the project was to create a space on stage that strengthens and expands the experience of the story told, and find design solutions that give an extra dimension to the story. The prerequisites for my work were partly defined from the produc¬tion, as were my limitations. In the cast of ten artists some were to play more than one role, often one of the opposite sex.

Nyckelfaktorer för en designs slutskede

The final stage of a designers work is always a bit tricky. Design is an abstract phenomenon and no one can tell when a design is really finished. The design process that designers work within has been thoroughly studied but cannot be truly mapped with strict constraints which the designer can follow to succeed. Therefore, in this paper we take a look at the final stage in the design process. The main goal is to get more knowledge and highlight key factors about what designers face when they are about finish their design or what forces them to leave a project that can stay in development for eternity.

Driftkostnadsanalys i väginvesteringsprojekt

During its lifetime, a road goes through a number of different stages; pre-study,inquiry of the road, work plan, documenting stage, building stage and operatingstage. The operating stage is the one that takes the longest time and costs themost. Those have a tendency of becoming unnecessarily high because the projectengineers don?t always take the management and maintenance prerequisites intoconditions.To decrease the management and maintenance costs, the Swedish RoadAdministration SouthEast has been in need of a work procedure that makes theroaddesign engineers take the management and maintenance of the road intoconsideration. This shall be achieved by a checklist where the most commondesigns that lead to increased management- and maintenance costs are compiledand listed.Through interviews with project leaders in management, the most commonproblems have been identified, analyzed and summarized under the headlineswinter-road, vegetation, road equipment and road designs.To elucidate the problem from several points of view, interviews wereimplemented with project leaders in investment and roaddesign engineers.

Hus på väg : En kostnadsstudie över flyttning av tre enfamiljshus

This thesis treats Building Information Modeling, BIM, in the production stage. Brieflydescribed BIM is virtual model of a building object where all information about theobject is gathered. All the involved operators in the construction project have access tothe model and can gather or share information about the project. There are several waysto apply BIM in the production stage. This thesis primarily deals with visualization of theobject, preparation and planning, the ability to take amounts from the model andcoordination and clash control.The basic issue was highlighted by Byggdialog AB.

Programvaruutveckling för en elektromagnetisk skanner med fokus på användaren, användarstudier och inlärning

The project was based on a request to improve an already existing program and hardware at the electrical engineering department at the royal institute of technology. For maximum ease of use, tests have been done on students to properly design the program for what it is meant to be used for. These tests have been transcribed and analysed, then brought back to the group in a discussion and then transcribed and analysed again, I call this process the ?four step process? (this process is presented and explained in chapter 6.4.). A part of this master thesis was also to analyse the four step process to enhance validity of this research.The project resulted in a new program with a new graphical view and features to help students and researchers to work with the technical tool for electromagnetic readings of planar objects.

BIM i produktionsskedet

This thesis treats Building Information Modeling, BIM, in the production stage. Brieflydescribed BIM is virtual model of a building object where all information about theobject is gathered. All the involved operators in the construction project have access tothe model and can gather or share information about the project. There are several waysto apply BIM in the production stage. This thesis primarily deals with visualization of theobject, preparation and planning, the ability to take amounts from the model andcoordination and clash control.The basic issue was highlighted by Byggdialog AB.

Utan ände - upprepning som illustrationselement

keywordsThis was a project about the process of animation and the presentation of looped animations in the form of a zine.My main subject for the project was to explore the possibilities of the computer program After Effects and how to incorporate the functions of this program with my hand drawn technique. I wanted to keep the hand drawn feeling and at the same time make use of all the helpful short cuts and utilities that this program had to offer. I found that this program was quite suitable for this kind of work, although I didn?t feel completely satisfied when it came to the amount of animations that I was able to put together. At the end of the project I had completed six loops (plus a older one) for the CD that came with the printed zine.Another big issue in working with this was the question of theme and content for all the different loops.

1 Nästa sida ->